75 |
RTR Pipe Installation works SGCP Project, from HDGP to HWGCP 1.New Installation of water line 12” & 14” Threaded Joint for 50 km. Contract Value: 9M
|
|
Completed
|
Abahussain/Saipem ARAMCO Project, HARADH.KSA
|
74 |
RTR Pipe Installation for SAOMPP project at Well ANDR 743, ANDR 745 and SAOMPP. Installation of water pipeline for 6” Threaded Joint for 14km and 10" Threaded Joint for 8KM . Contract Value 3M
|
|
Ongoing |
Nesma and Partner, OMPP Aramco harad, abqaiq |
73 |
Design and Installation of piping network related to mechanical & Instrumentation work of the Gasoline & Diesel station area at Jafurah Upstream TCF project. Contract Value SAR 1M
|
|
Ongoing |
Abdul Mohsen Al Tamimi Co ARAMCO Project, Jafurah.KSA
|
72 |
RTR Piping works BERRI DEVELOPMENT – EXPAND ABU ALICRUDE Processing Facilities & KGP Facilities Expansion. 27000LM Contract Value: SAR 18M
|
|
|
Sinopec,ARAMCO Project, Abuali, KSA
|
71
|
Maaden Pipeline Maintenance Project (450KM) for 3 years. Maintenance of pumps station, pipe line and inline valves.Contract Value: SAR 18M
|
30 May 2022
|
Completed
|
Maaden Gold, Taif, KSA
|
70
|
GRE/RTR Piping fabrication, installation, hydro testing and re-commissioning.Contract Value: SAR 9M
|
30 June 2021
|
Completed
|
KCC, HARAD Compressor stations.
|
69
|
Marafiq GE 7FA frame unit , auxiliary scopeoverhauling of 28 pumps and motors for 4 units GT21,GT22, GT22 and GT33. Contract Value: SAR 7.7M
|
19 Dec 2017
|
Completed
|
GE, Marafiq IWPP , Jubail
|
68
|
Removal & Reinstallation of Waste heat Boiler and Super Heater.
|
Initial Acceptance 30 Jan 2017
|
Completed
|
Raised sulphate acid factory ,Jubail
|
67
|
24”water pipe Saudi Aramco Re-Route Pipeline in Ras Tanura of 41 KM to rastanura.Contract Value: SAR 7.7M
|
|
Completed
|
Saudi Aramco Re-Route Pipeline in, Ras Tanura CPP
|
66
|
Repair and replacement of firewater pipe line and drinking water pipe line near chlorination building of Desalination area. Work include civil , mechanical and piping (RTRP)Contract Value: SAR 14.5M
|
4 Mar 2018
|
Completed
|
Marafiq IWPP, Plant,Jubail, Client JOMEL
|
65
|
Design Engineering & Construction Lump sum for Furnace & Rail foundation Contract Value: SAR 1.1M
|
|
Completed
|
NATCO Al-Rushaid Middle East Ltd
|
64
|
Constructing the new entrance gate with security room & Access road to Marafiq IWPP Contract Value: SAR 1.5M
|
|
Completed
|
JWAP,Jubail
|
63
|
HRSG Thermocouple installation testing & Commissioning Contract Value: SAR 190K
|
|
Completed
|
JWAP,JUBAIL
|
62
|
Fence installation ,HVAC, testing commission Ning, skylight repairing, civil backfilling, compaction, & asphalt work. Contract Value: SAR 1.5M
|
18-May-18
|
Completed
|
KIDMAH LLC KHOBAR
|
61
|
GRE/RTR Piping fabrication, installation , hydro testing and recommissioning Contract Value: SAR 8M
|
Initial Acceptance
|
Completed
|
Fadili gas plant project , KCC/TR
|
60
|
TP8 form piping, Pump house, and fire water head installation works. GRE/RTR and FRP
|
18-Mar-18
|
Completed
|
Pan Gulf industrial Systems, Marafiq Jubail
|
59
|
Sprinkler systems installation in 5 plants SWTP9,TP8,nwps, SWC and control room
|
10-Oct-17
|
Completed
|
Pan Gulf industrial Systems, Marafiq Jubail
|
58
|
TP9 Pump house construction, civil foundation, Structural works, roof, door and lovers.
|
10-Apr-18 7
|
Completed
|
Pan Gulf industrial Systems, Marafiq Jubail
|
57
|
Fire water Upgradation project at Marafiq TP8 including trench preparation, pipe laying, fire hydrants installation commissioning.GRE/RTR and FRP.Contract Value: SAR 14.8M
|
2-Feb-16
|
Completed
|
Pan Gulf industrial Systems, Marafiq Jubail
|
56
|
Steel structural errection work arrond 700 tons in critical area. In addition, grating and light structure.Contract Value: SAR 2.3M
|
|
Ongoing
|
KCC, Safco 4 rehabilitation and revamp project
|
55
|
Replacement of piping spool works air liquid plant Qurayyah
|
24-Feb-16
|
Completed
|
FS Elloitt, Qurayyah
|
54
|
Tank foundation preparation at Sea water cooling area
|
20-Jan-16
|
Completed
|
Pan Gulf industrial Systems, Marafiq Jubail
|
53
|
Fire water Upgradation project at Marafiq NWPS including trench preparation, pipe laying, fire hydrants installation commissioning GRE/RTR and FRP Contract Value: SAR 3.5M
|
|
Ongoing
|
Pan Gulf industrial Systems, Marafiq Jubail
|
52
|
SEC Scaffolding contract for boiler,hrsg, and steam turbine for major outages (eastern province). Contract Value: SAR 3.5M
|
|
Ongoing
|
Saudi Electric Company
|
51
|
Relocation of Fire cabinet main control panel, testing and commission in GTG units
|
18-Dec-15
|
Completed
|
General Electric, Qurayyah CCPP
|
50
|
Additional cabling work including testing from GTE mark Vi panel to Generator Collector Cab Main Control Panel in 18 GTG units. Contract Value: SAR 3.2M
|
11-Nov-15
|
Completed
|
General Electric, Qurayyah CCPP
|
49
|
GT#2 painting and concrete column repair work including tools and equipment’s
|
7-Oct-15
|
Completed
|
Atlantic projects, Qurayyah CCPP
|
48
|
Scaffolding erection for dismantling and reinstallation of GT#2 pipe rack insulation work
|
1-Oct-15
|
Completed
|
Atlantic projects, Qurayyah CCPP
|
47
|
Excavation, reinforcement, preparation and casting of 53 concrete foundation for installation rigging separator, MOVs, pipe support, nitrogen tank, liquid fuel tank etc.Contract Value: SAR 1.8M
|
20-Sep-15
|
Completed
|
KAOFU technical Services, berry gas station, Jubail
|
46
|
site facility and Lay down preparation, porta cabin installation, foundation casting, trech preparation for cable laying,
|
15-Sep-15
|
Completed
|
KAOFU technical Services, berry gas station, Jubail
|
45
|
Fire water Upgradation project at Marafiq SWTP#9 including trench preparation, pipe laying, fire hydrants installation commissioning
|
11-Jul-15
|
Ongoing
|
Pan Gulf industrial Systems, Marafiq Jubail
|
44
|
PDB relocation, cable tray erection, Cable pulling, Testing and Termination work
|
12-Apr-15
|
Completed
|
Crown international, Dammam industrial Area
|
43
|
Cable tray erectrion works
|
6-Apr-15
|
Completed
|
Aljohran Contracting, SWCC , Alkhobar
|
42
|
Maintenance Team for underground piping work
|
22-Mar-15
|
Completed
|
Maaden Pipe line Project Taif
|
47
|
Modification of Stackor area structural & mechanical work
|
15-Mar-15
|
Completed
|
Eastern province Cement Co.
|
41
|
Scaffolding erection for dismantling and reinstallation of Air in let duct filter
|
3-Mar-15
|
Completed
|
Atlantic projects, Qurayyah CCPP
|
40
|
Scaffolding erection for dismantling and reinstallation of Bypass stacks,Pipe racks
|
20-Feb-15
|
Completed
|
Atlantic projects, Qurayyah CCPP
|
38
|
Scaffolding erection for gas turbine Major outages
|
5-Dec-15
|
Completed
|
General Electric, PP-3 Power plant Jeddah
|
35
|
HVAC Ducting work at Sabic technology center
|
5-Aug-14
|
Completed
|
Sabic
|
34
|
Construction of Switchgear room
|
10-Aug-15
|
Completed
|
Hyundai Heavy Industries , JSTP Jeddah
|
33
|
Installation of sump pump including foundation preparation
|
7-Aug-15
|
Completed
|
Hyundai Heavy Industries , PP_11 Riyadh
|
32
|
380KV S/C OHTL inter connection of IRRQAA (#9034 BSP to # 9002 S/S and IRRQAA (#9034) to #9004 S/S
|
10-Jun-15
|
Completed
|
GS Engineering PP12, Riyadh
|
31
|
RTRP pipe Line work installation of 18"main header and hydrotesting.
|
2-May-14
|
Completed
|
Maaden Pipe line Project Taif
|
30
|
Scaffolding work for GTE shut down work at Makkah power plant
|
17-Mar-14
|
Completed
|
PP_3 power plant Jeddah
|
29
|
33.5KV substation building inside plant civil , HVAC, plumbing and electrical works
|
15-Mar-15
|
Completed
|
Chemnol,Saudi Arabia
|
28
|
Scaffolding work for GTE shut down work at Makkah power plat
|
2-Feb-14
|
Completed
|
Makkah Power Plant
|
27
|
Fiber Glass reinforce Plastic Butt & wrapping work
|
15-Jan-14
|
Completed
|
Ramoz Al Thumiz Company,RC Jubail
|
26
|
GTG Modification work , collector cab ventilation upgradation project
|
1-Feb-14
|
Completed
|
Saudi Electrical Company, Faras Power Plant Udaliya
|
25
|
Installation of sump pump including foundation preparation and preparation and installation of duct bank, Manhole
|
9-Oct-13
|
Completed
|
Hyundai Heavy Industries , PP_11 Riyadh
|
24
|
GTG Modification work , collector cab ventilation upgradation project
|
1-Nov-13
|
Completed
|
Saudi Electrical Company,Qurrayah PP1 &2
|
23
|
Fuel gas Buffer Modification project
|
4-Feb-14
|
Completed
|
Hyundai Heavy Industries , PP_11 Riyadh
|
22
|
Renovation of old interlock , 50000 Sq feets Removal of old tiles and installation of new tiles
|
30-Jun-11
|
Completed
|
AARTCO. , Royal commission sanitary landsil expansion project.
|
21
|
Collector cab modification work for 12 Gas Turbine Generator
|
18-Oct-12
|
Completed
|
General Electric Inc.Marafiq IWPP
|
20
|
Repair work for stack welding inside the by stack of Gas Turbine generator
|
14-Oct-12
|
Completed
|
Braden LLC,Marafiq IWPP
|
19
|
Scaffolding Errection for Installing the chiller Air condition unit to Gas turbine generator
|
2-Aug-12
|
Completed
|
Saudi Electrical Company,Qurayyah plant 1& 2,Udaliya
|
18
|
Scaffolding Errection for Installing the chiller Air condition unit to Gas turbine generator
|
14-Mar-12
|
Completed
|
Saudi Electrical Company.
|
17
|
Lifting and transportation of GTG rotor from Faras power to Dammam
|
12-Feb-12
|
Completed
|
General Electric Inc.,Faras Power Plant
|
16
|
Performance Heater Valves and pipe line modification on 12 Gas Turbine. Modification of Feed Water lines
|
30-Jul-12
|
Completed
|
General Electric Inc. Marafiq IWPP project
|
15
|
Transportation and removal of Transformer from Nasariya power plant to Milsa shop in Dammam for refurbishment
|
30-Apr-12
|
Completed
|
General Electric Inc,Nasariya SEC Plant
|
14
|
Platform installation on HRSG’
|
30-May-12
|
Completed
|
Doosan heavy industries, Marafiq IWPP
|
13
|
Erection of Scaffolding in 3 Stack for repainting of internal stacks. Area around 2500 m3 each up to height 40mts.
|
30-May-12
|
Completed
|
Technical Contracting Company, Al Jubail Power Plant
|
12
|
33.5KV substation building inside plant civil , HVAC, plumbing and electrical works and switch gear room
|
12-Aug-11
|
Completed
|
Hyundai Heavy Industries , PP_11 Riyadh
|
11
|
Scaffolding project 1 year complete contract for Steam turbine and Gas turbine Generator Inspection and Plant Outages in year 2010 and 2011 , Total 70,000 m3 area erected in different outages and units
|
17-Jun-11
|
Completed
|
General Electric Inc.
|
10
|
Site facilities preparation and Site offices(HVAC, Potable cabins and parking facilities installation for Independent Power Plant-11 in Dhurma
|
30-Jun-11
|
Completed
|
Sung Do IPP-11.Dhurma, Riyadh
|
9
|
SCR Probe Access Platforms on 12 Gas Turbines at elevation of 28 Mts height, Access includes ladder, grating, frames and handrails. 2 Sqmts structural Steel platform erected with 100 ton crane
|
15-Jul-10
|
Completed
|
General Electric Inc. Marafiq IWPP project
|
8
|
Renovation of old interlock , 50000 Sq feets Removal of old tiles and installation of new tiles
|
30-Jun-11
|
Completed
|
AARTCO. , Royal commission sanitary landsil expansion project.
|
7
|
Cable trench excavation, back filling, asphalt cutting, conducting, cable pooling, fiber optic cable erection work, installing of Security system, fencing work
|
12-Jun-11
|
Completed
|
THALES ,Khursaniyah AFK project,
|
11
|
380kV Transmission Line from Jubail 380/230 kV SS. To Maaden 380kV Sub Station
|
30-Jun-08
|
Completed
|
Al Masa Group company, Jubail Maaden.
|
6
|
Modification of Stack Silencer, removal and installation silencer splitter of 3.1 M from stack of 90M height and welding of supports 20mm think CS plates. 3 Stacks
|
30-May-11
|
Completed
|
Technical Contracting Company, Al-Jubail Power Plant.
|
5
|
Iso-phase bus duct pressurization system modification, Installation of tubing’s, relief Valves, intersection drain valves, control panels, solenoid valves, control cabling, commissioning and Testing. On 12 Gas Turbines and 4 Steam Turbines
|
15-Dec-11
|
Completed
|
General Electric Inc. Marafiq IWPP project
|
4
|
Neutral Grounding Transformer repair and replacement of earthing cables and NGT to Bushing box termination and Installation on 4 Steam Turbines
|
1-Dec-11
|
Completed
|
General Electric Inc. Marafiq IWPP project
|
3
|
Excitation Cooling Fan power segregation from Switch Gear room to Excitation compartments 480 V 3 core cable 6KM in 12 Gas turbines and 4 Steam turbines
|
4-Mar-11
|
Completed
|
Jubail O&M Company Marafiq IWPP
|
2
|
Fiber Optic Cable Laying and Termination from Mark IV panel to Gas chromatograph panel and Panel installation, commission and Testing.(Modification in Warranty period)
|
15-Jul-11
|
Completed
|
General Electric Inc, Marafiq IWPP Project
|
1
|
Civil and installation work
|
21-Mar-11
|
Completed
|
Thales Co.
|